Thursday, May 22, 2008

Stripping and Waterproofing

The walls now had to be stripped of their forms and waterproofing compound applied to the walls. There is then a drainage mat applied over the waterproofing compound. Then a footing drain placed around the base and covered with about 52 tons of gravel before backfilling.

No comments: