Thursday, May 22, 2008

Almost Ready for Foundation

I established a grade at which I would put the foundation on. This was to be 1156 ft above mean sea level based on the Surveyors topographic survey. The site is now almost ready for a foundation. Plumblee Surveying did a battery of surveys starting from the topo survey.

No comments: